next up previous
Next: About this document Up: An Integrated Multi-Channel Readout Previous: Future Plans

References

1
``Signal Processing and Front End Electronics for the ATLAS Muon Detector'', C. Blocker et al, First Workshop on Electronics for LHC Experiments, LISBON, 11-15 Sept 1995, LIP Lisbon

2
ATLAS Internal Note MUON-NO-111, 1 March 1996, Eric Hazen, Jim Shank, Tom Giordano, John Huth, John Oliver.

3
IEEE 1149.1 Standard Test Access Port and Boundary-Scan Architecture

4
``Noise Considerations for the ATLAS Muon front end Electronics'', C. Blocker, J. Huth, J. Oliver, ATLAS Note MUON-NO-080 (1995)

5
``A CMOS Multichannel IC for Pulse Timing Measurements with 1-mV Sensitivity'', M. J. Loinaz, B. A. Wooley, IEEE JSS Vol. 30 No. 12, December 1995.

6
``Trailing Edge Timing Studies with Prototype ATLAS Muon Drift Tubes'', J. Shank et al, First Workshop on Electronics for LHC Experiments, LISBON, 11-15 Sept 1995, LIP Lisbon

7
R.Veenhof, GARFIELD, A Drift Chamber Simulation Program, Version 5.13, CERN, 1995, http://consult.cern.ch/writeup/garfield/main.html

8
``IC Reliability Simulation'', C. Hu, IEEE JSS, Vol. 27, No. 3, March 1992

9
``Berkeley Reliability Tools - BERT'', R.H. Tu et al, IEEE Trans. on CAD, Vol. 12, No. 10, Oct. 1993, pp.1524-1534.

10
A. Ferrari, private communication, Sept 1996. See also ATLAS Internal Note MUON-NO-90.

11
F. Faccio (CERN ECP/MIC) private communication, Sept 1996.


Eric Hazen
Thu Oct 10 18:19:00 METDST 1996